We've detected that your browser is not JavaScript enabled which may diminish your user experience.

We've detected that your browser is not JavaScript enabled which may diminish your user experience.

We've detected that your browser is not JavaScript enabled which may diminish your user experience.

We've detected that your browser is not JavaScript enabled which may diminish your user experience.

See Also:
- Auctions
- Previous
- Search
- For Sale

New Accommodation Buildings

This is a past auction. Click here for current auctions
Thursday 21st April 2016 at 11:00 AM
Location: 142 Churchill Rd North, CAVAN SA 5094  View Map
Under Instructions: from a third party Olympic Dam mining identity
Fees: A Buyers Premium of 8.80% Will Apply, Sale is GST Inclusive
Enquiries: Andrew Maros 0418 845 884 andrewm@mgs.net.au
Live Auction Webcast: https://www.interbid.com.au/mgs
Summary
Photos
Catalogue
Print Catalogue
 

48 CIMC Relocatable Accommodation Units, Self Contained Services, Never Installed


All Buildings to be sold on an Individual Basis

Units Comprising
- 23 x 4 Bedroom Upper Level Units
- 22 x 4 Bedroom Ground Level Units
- 1 x 3 Bedroom With Store/Comms Area Unit
- 2 x 2 Bedroom/Disabled Ground Level Unit
- 1 x Laundry Split Room Open Plan Unit

Building Dimensions
- 15.15m x 4.45m Including services frame containing hot water services, air conditioner units & switch gear. 
- All buildings have category rating to suit an A1 Region. 

Accommodation Building Contents (2, 3 & 4 Room) 
- Air Conditioning - Daikin Inverter, Heat Pump Outdoor Unit, Model RXS25KVMA. Indoor Unit, Model FTXS25KVMA 
- Hot Water Service - Rheem MPi-325 Integrated Heat Pump, Electric, 325 Litre, Model 55132505 
- Fridge - Haier 130 Litre, Model HBF130W 

- Each Room Also Features: 100% Block Out Blinds, Cordless Kettle, King Single Ensemble Bed & Mattress, Bedside 3 Drawer Mobile Unit, Fixed Shelf Unit, 2 Door Lockable Storage Cupboard, Desk, Black Mesh Chair, Ensuite comprising Imperial Ware Ceramic 4 Star Water Rating Dual Flush Toilet, 2 Door Lockable Ceramic Vanity, Glass Door Shower, Tiled Ensuite Floor, Rooms Wired for Voice & Data, 4 x Double Power Outlets (10 Amp), 1 x Single Power Outlet (10 Amp), Hard Wired Smoke Detector. 

Australian Standards 
The following Australian Standards have been used in the checking of buildings 

- AS/NXS1170.0:2002 Structural Design Actions 
- AS/NZS1170.1:2002 Permanent, imposed & other actions 
- AS/NZS1170.2:2011 Wind Load Actions 
- AS1170.4:2007 Earthquake Load Actions 
- AS4100-1998 Steel Structures 
- AS/NZS4600:2005 Cold Formed Structures 

Salvage
Bulk Two Storey Fixtures (Break Bulk) to include
- Stair Cases, Platforms, Walkways, Fasteners, Structural Fixtures (To Be Sold in Bulk Lots)

Auction Conditions 
- Enclosed footwear must be worn. Persons under the age of 16 will not be allowed onsite.
- Any such contractors will wear at all times any prescribed safety equipment (PPE).
- Within 24 hours a $5,000 deposit must be received by MGS with full balance to be paid by no later than Friday 29th April 2016. 

Removal and Loading
- Organised times will be allocated to each building for site delivery (This will keep loading costs to a minimum for each buyer).
- A selected approved vendor contractor will be available for quotation for both loading and/or transport.
- The buyer can utilise our selected transport contractors or provide their own subject to the conditions laid out by the crane contractor.
- All costs involved in the removal of assets are at the purchasers expense. All loading funds to be paid prior to loading of units.
- Loadout of 4 buildings per day (morning and afternoon time slots available) (with the exception of inclement weather).

Loading Costs - Churchill Rd North
- $1,650 will be invoiced to the purchaser per building to cover crane operator and rigger authorised by third party mining contractors, approved by vendor.
- This will be paid with invoice upon settlement.    

Loading Dates are as follows
Week 1 - Tues 3rd May, Weds 4th May, Thurs 5th May
Week 2 - Tues 10th May, Wed 11th May, Thurs 12th May
Week 3 - Tues 17th May, Wed 18th May, Thurs 19th May, Fri 20th May
Week 4 - Tues 24th May

Transport Beams:
Sets of 5 will be available for sale at cost of $950 per set if required. Please allow at least 5 working days for delivery.

Salvage - Break Bulk Collection (Lots 50-126):
Collection available from Tuesday 26th April - Friday 29th April (times and loading costs TBA)

Notes

- Buildings Upper or Ground Level Can Be Installed as Stand Alone Units or Constructed in the Proposed 2 Level Format.